Custom High-Quality Formwork Solutions for Innovative Building Projects

Product Details
Customization: Available
After-sales Service: Contact Us If You Need Any Help
Warranty: None
Still deciding? Get samples of $ !
Request Sample
Manufacturer/Factory & Trading Company

360° Virtual Tour

Diamond Member Since 2024

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Importers and Exporters
The supplier has import and export rights
Fast Delivery
The supplier can deliver the goods within 15 days
Management Certification
The supplier has quality management system certification, including:
ISO45001:2018 certificate
ISO9001:2015 certificate
ISO14001
Environmental Protection
The supplier has relevant environmental protection qualifications, including:
-Environmental impact assessment report
-The company have EIA reply
-The supplier actual founding consistent with EIA acceptance comments
-Pollution discharge permit
-Fixed pollution source pollution discharge registration
to see all verified strength labels (19)
  • Custom High-Quality Formwork Solutions for Innovative Building Projects
  • Custom High-Quality Formwork Solutions for Innovative Building Projects
  • Custom High-Quality Formwork Solutions for Innovative Building Projects
  • Custom High-Quality Formwork Solutions for Innovative Building Projects
  • Custom High-Quality Formwork Solutions for Innovative Building Projects
  • Custom High-Quality Formwork Solutions for Innovative Building Projects
Find Similar Products
  • Overview
  • FAQ
Overview

Basic Info.

Model NO.
Aluminum Formwork
Type
Industrial Aluminium Profile
Shape
Flat
Grade
6061-T6
Temper
T3-T8
Window & Door Aluminium Profile
Industrial Aluminum Profile
Alloy
Alloy
Surface Finishing
Powder Spraying
Alloying Ingredient
6061
Certification
ISO
Polished Aluminum Profile
Mechanical Polishing
Aluminium Grade
6061-T6
Tonnage/Contaioner
25 Ton
Package
Not Packed or Fumigated Wood Packaging
HS
8480600090
Density
2.72
Currency
USD
Transport Package
Container
Specification
Contact us for specific details
Trademark
Yingmo
Origin
Shangqiu Minquan
HS Code
8480600090
Production Capacity
10W-20W Square Meters / Mouth

Product Description

 
Aluminum Formwork Assembly: A Comprehensive Guide to Modern Construction Solutions

In the dynamic realm of modern construction, aluminum formwork assembly emerges as a transformative force, revolutionizing traditional building methodologies. Employing precision-crafted prefabricated aluminum panels and components, this cutting-edge system forms impeccable molds for concrete, offering unmatched efficiency and uniformity. By elevating beyond conventional practices, it promises accelerated speed, enhanced quality, and sustainable building solutions. Dive into the comprehensive guide below to explore its groundbreaking potential:

 
Custom High-Quality Formwork Solutions for Innovative Building Projects

Panel Placement: Precision and Ease Combined:

  • Step 1 Step 1 involves the careful arrangement of lightweight, state-of-the-art aluminum formwork panels into the desired configuration, with meticulous adherence to the project's architectural blueprint.
  • Expertly pre-engineered panels interlock seamlessly, ensuring dimensional precision while preserving the architectural integrity of the structure post-concrete setting.
  • Owing to their ultra-light structure, these aluminum panels are effortlessly maneuverable, substantially lessening worker fatigue and expediting the entire assembly process.
  • Securing Panels: Ensuring Stability and Integrity:

    • In Step 2, panels are securely anchored with various connectors including clips, bolts, and wedges, each vital for maintaining the assembly's structural integrity.
    • These steadfast securing elements lock the panels together firmly, creating a stable mold that prevents any misalignments or gaps.
    • Ingeniously designed corner and edge connectors bolster the formwork's strength, ensuring a tight seal during concrete pouring and effectively precluding leaks.
Custom High-Quality Formwork Solutions for Innovative Building Projects
CUSTOMER:  Incoterm:  FOB QingDao
 
Date: Dec 24th
Part No. Part Description Unit price (USD/kg) Processing charges USD/kg Transport from Minquan to Qingdao Port USD/kg
1 C100-C500 Panel  < A00(Changjiang Ingot price)(Today USD2.725)/1.13 USD 0.49/kg USD 0.08/Kg 
2 C600 Panel  USD 0.61/kg
3 C100-C400 <(aluminum formwork (extrusion)) A00(Changjiang Ingot price)(Today USD2.725)/1.13 USD 0.34/kg USD 0.053/kg
4 C400-450-500(aluminum formwork(extrusion)) USD 0.40/kg
5 C600(aluminum formwork(extrusion)) USD 0.50/kg
Custom High-Quality Formwork Solutions for Innovative Building Projects
Custom High-Quality Formwork Solutions for Innovative Building Projects
  • Adjustment and Alignment: Achieving Perfect Symmetry:

    • Once panels are positioned, Step 3 demands meticulous adjustment to achieve impeccable alignment and leveling, a crucial task to ensure the construction's structural soundness.
    • Perfect alignment is imperative, preserving the concrete's structural integrity and precise geometry, ensuring dimensions and stability remain flawless.
  • Reinforcement Installation: Building Strength from Within:

    • Step 4 involves the strategic placement of vital steel reinforcement bars (rebar) within the formwork, meticulously following the structural design.
    • Rebar is crucial, providing tensile strength to the concrete, reducing cracking, and ensuring long-lasting structural durability post-curing.
    • Each bar is precisely positioned, ensuring seamless incorporation into the concrete during the subsequent pouring phase.
Custom High-Quality Formwork Solutions for Innovative Building Projects

Concrete Pouring: The Final Pour to Perfection:

  • With all preparations complete, Step 5 ushers in the transformative act of pouring concrete into the mold, marking a pivotal phase in the construction process.
  • The reliable aluminum panels preserve the concrete's precise shape, guaranteeing a flawless surface finish once removed.
  • Employing aluminum formwork significantly enhances the finish quality, minimizing the necessity for extensive finishing work post-hardening.

Custom High-Quality Formwork Solutions for Innovative Building Projects
Dismantling and Reuse: Embracing Sustainability
:

  • Post-curing, the process concludes with Step 6 , which involves the careful dismantling of the formwork, showcasing sustainability and cost-effectiveness.
  • The robustness and corrosion resistance of aluminum allow these panels to be reused multiple times, highlighting the formwork's eco-friendly and economical benefits.
  • Our panels are subjected to an exceptionally rigorous cleansing and inspection routine, ensuring they are immaculately prepared for immediate reuse. This meticulous approach dramatically minimizes waste and maximizes resource efficiency, setting a new precedent for sustainable construction practices. Henan Yingmo Aluminum Co., Ltd. is at the forefront of environmental responsibility, showcasing an unwavering commitment to eco-friendly building solutions.
Custom High-Quality Formwork Solutions for Innovative Building Projects

Advantages of Aluminum Formwork Assembly: Revolutionizing the Construction Industry with Pioneering Innovation.

  • Accelerated Construction Timelines: Propel Your Projects to Completion at Remarkable Speeds.: Our ultra-lightweight panels are brilliantly designed for effortless maneuverability and swift assembly, effectively reducing construction timelines and propelling projects toward rapid and seamless completion.
  • Superior Quality Finish: Meticulously Crafted to Perfection for Unparalleled Aesthetic Excellence.: Discover the extraordinary benefits of our aluminum formwork, precisely engineered to deliver smooth and exceptionally accurate concrete surfaces. This groundbreaking technology minimizes the need for extensive post-pour finishing, ensuring a flawless finish with every application, and setting new quality benchmarks in the construction industry.
  • Exceptional Reusability: Celebrating Durability and Cost-Efficiency.: Our aluminum formwork is renowned for its extraordinary durability and unparalleled reusability, expertly crafted to endure numerous concrete pours. This remarkable quality not only results in significant material cost savings but also dramatically reduces construction waste, offering immense economic and environmental benefits.
  • Ultimate Cost-Effectiveness: Investing Wisely in the Future of Construction.: Embrace the future of construction with our aluminum formwork. Although the initial investment may exceed traditional options, the profound long-term financial benefits are undeniable. Experience substantial savings through its outstanding reusability and reduced labor costs, positioning this formwork as the ultimate choice for cost-effectiveness and financial wisdom.
  • Enhanced Safety Standards: Advancing Worker Health and Safety through Innovative Design.: With a steadfast commitment to the health and safety of construction teams, our lightweight aluminum formwork system incorporates superior safety features. Its ease of handling significantly reduces physical strain, enhancing safety standards on construction sites and fostering a healthier, more productive work environment.

Conclusion: Establishing the New Gold Standard in Modern Construction.:

Our aluminum formwork assembly sets a new benchmark for efficiency and effectiveness, offering a streamlined process that surpasses traditional systems. It ensures rapid assembly, immaculate finishes, and exceptional reusability, accelerating construction timelines and substantially lowering project costs. This makes it the ideal choice for addressing the complex challenges of modern construction projects, leading the future of building innovation.

    FAQ

    Q: Are you trading company or manufacturer ?
    A: We are factory.

    Q: How long is your delivery time?
    A: Generally it is 5-15 days if the goods are in stock or it is 15-20 days if the goods are not in stock.It is according to quantity.

    Q: Do you provide samples ? Is it free or extra ?
    A: Yes, we could offer the sample for free charge.

    Q: What is your terms of payment ?
    A:Payment terms:30% down payment, 70% on Copy of B/L.
    Other Payment terms(LC) : letter of credit 60 days leave Qingdao port and 10% deposit.


    If any question, please feel free to contact us !

    Send your message to this supplier

    *From:
    *To:
    *Message:

    Enter between 20 to 4,000 characters.

    This is not what you are looking for? Post a Sourcing Request Now
    Contact Supplier