Durable Aluminum Formwork Solutions for Long-Lasting Construction Projects

Product Details
Customization: Available
After-sales Service: Contact Us If You Need Any Help
Warranty: None
Still deciding? Get samples of US$ 90/Square Meter
Request Sample
Manufacturer/Factory & Trading Company
Diamond Member Since 2024

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Importers and Exporters
The supplier has import and export rights
Fast Delivery
The supplier can deliver the goods within 15 days
Management Certification
The supplier has quality management system certification, including:
ISO45001:2018 certificate
ISO9001:2015 certificate
ISO14001
Environmental Protection
The supplier has relevant environmental protection qualifications, including:
-Environmental impact assessment report
-The company have EIA reply
-The supplier actual founding consistent with EIA acceptance comments
-Pollution discharge permit
-Fixed pollution source pollution discharge registration
to see all verified strength labels (19)
  • Durable Aluminum Formwork Solutions for Long-Lasting Construction Projects
  • Durable Aluminum Formwork Solutions for Long-Lasting Construction Projects
  • Durable Aluminum Formwork Solutions for Long-Lasting Construction Projects
  • Durable Aluminum Formwork Solutions for Long-Lasting Construction Projects
  • Durable Aluminum Formwork Solutions for Long-Lasting Construction Projects
  • Durable Aluminum Formwork Solutions for Long-Lasting Construction Projects
Find Similar Products
  • Overview
  • FAQ
Overview

Basic Info.

Model NO.
Aluminum Formwork
Type
Industrial Aluminium Profile
Shape
Flat
Grade
6061-T6
Temper
T3-T8
Window & Door Aluminium Profile
Industrial Aluminum Profile
Alloy
Alloy
Surface Finishing
Powder Spraying
Alloying Ingredient
6061
Certification
ISO
Polished Aluminum Profile
Mechanical Polishing
Aluminium Grade
6061-T6
Tonnage/Contaioner
25 Ton
Package
Not Packed or Fumigated Wood Packaging
HS
8480600090
Density
2.72
Currency
USD
Transport Package
Container
Specification
Contact us for specific details
Trademark
Yingmo
Origin
Shangqiu Minquan
HS Code
8480600090
Production Capacity
10W-20W Square Meters / Mouth

Product Description

 
Aluminum Formwork Assembly: Detailed Overview

Aluminum formwork assembly stands as a cornerstone in the realm of modern construction, utilizing expertly crafted prefabricated aluminum panels and components to create seamless molds for concrete pouring. This innovative process is not only efficient and swift but also remarkably reusable, presenting substantial advantages over traditional methods. Here's an in-depth exploration of the process:

 
Durable Aluminum Formwork Solutions for Long-Lasting Construction Projects

Panel Placement:

  • Step 1 involves strategically arranging the lightweight aluminum formwork panels into the precise configuration required by the project's design and layout.
  • These meticulously pre-engineered panels are crafted to interlock perfectly, offering exact dimensions to ensure that the structure's shape is maintained with precision once concrete is poured.
  • Thanks to their lightweight nature, aluminum panels are not only easy to handle but also lessen the physical burden on workers, significantly accelerating the construction process.
  • Securing Panels:

    • In Step 2, the panels are meticulously secured using an array of connectors such as clips, bolts, or wedges.
    • These fastening devices play a crucial role in ensuring that the panels are firmly attached to create a rigid, stable mold, thereby preventing any gaps or misalignments.
    • Specially crafted accessories, including corner and edge connectors, are employed to maintain the formwork's structural integrity and prevent any leaks during the concrete pouring phase.
Durable Aluminum Formwork Solutions for Long-Lasting Construction Projects
CUSTOMER:  Incoterm:  FOB QingDao
 
Date: Dec 24th
Part No. Part Description Unit price (USD/kg) Processing charges USD/kg Transport from Minquan to Qingdao Port USD/kg
1 C100-C500 Panel  < A00(Changjiang Ingot price)(Today USD2.725)/1.13 USD 0.49/kg USD 0.08/Kg 
2 C600 Panel  USD 0.61/kg
3 C100-C400 <(aluminum formwork (extrusion)) A00(Changjiang Ingot price)(Today USD2.725)/1.13 USD 0.34/kg USD 0.053/kg
4 C400-450-500(aluminum formwork(extrusion)) USD 0.40/kg
5 C600(aluminum formwork(extrusion)) USD 0.50/kg
Durable Aluminum Formwork Solutions for Long-Lasting Construction Projects
Durable Aluminum Formwork Solutions for Long-Lasting Construction Projects
  • Adjustment and Alignment:

    • Once the panels are strategically arranged, Step 3 entails fine-tuning their positioning to ensure flawless alignment and leveling.
    • Precision in alignment is pivotal in preserving the structural integrity and geometric accuracy of the concrete structure. This step guarantees that walls, floors, or slabs achieve the desired dimensions and stability.
  • Reinforcement Installation:

    • Step 4 involves the meticulous placement of essential steel reinforcement bars (rebar) within the formwork, adhering strictly to design specifications.
    • Rebar is indispensable for imparting tensile strength to the concrete, preventing any cracking or structural failure after the concrete has cured.
    • Careful positioning of the reinforcement is crucial to ensure its proper embedding within the concrete during the pouring operation.
Durable Aluminum Formwork Solutions for Long-Lasting Construction Projects

Concrete Pouring:

  • With the formwork and reinforcement expertly positioned, Step 5 involves the crucial task of pouring concrete into the mold.
  • The aluminum panels maintain the concrete in its intended shape as it sets, guaranteeing a smooth, accurate surface once the formwork is removed.
  • Aluminum formwork delivers a superior quality finish, which minimizes the need for additional finishing touches post-hardening of the concrete.

Durable Aluminum Formwork Solutions for Long-Lasting Construction Projects
Dismantling and Reuse
:

  • After the concrete has fully solidified, Step 6 entails the careful dismantling of the formwork.
  • Given aluminum's robust durability and resistance to corrosion, these panels can be reused multiple times, marking aluminum formwork as an economical and eco-friendly choice.
  • The panels undergo cleaning, inspection for any wear, and preparation for subsequent use in new projects, thus minimizing material waste and cost.
Durable Aluminum Formwork Solutions for Long-Lasting Construction Projects

Advantages of Aluminum Formwork Assembly:

  • Faster Construction: The lightweight panels facilitate easy handling and quick assembly, expediting the entire construction process. This efficiency translates into shortened timelines and accelerated project completion.
  • Impeccable High-Quality Finish: Our aluminum formwork offers an exceptionally smooth and precise surface for concrete, significantly diminishing the need for labor-intensive post-pour finishing work.
  • Superior Reusability: With the ability to be utilized across numerous concrete pours, our aluminum formwork delivers substantial cost savings and plays a vital role in minimizing material waste in your construction projects.
  • Unmatched Cost-Effectiveness: Although the initial expenditure may exceed that of conventional formwork, the enduring value from repeated reuse and reduced labor costs renders our aluminum formwork a judicious investment for any construction endeavor.
  • Enhanced Safety Measures: Designed to be lightweight and effortlessly manageable, our system alleviates physical strain on your workforce, promoting a safer environment on your construction sites.

Concluding Insights:

Embrace a more streamlined and efficient construction experience with our aluminum formwork system. Offering rapid assembly, extraordinary quality finishes, and remarkable reusability, it accelerates building timelines and slashes project costs, standing as the quintessential choice for forward-thinking construction initiatives.

    FAQ

    Q: Are you trading company or manufacturer ?
    A: We are factory.

    Q: How long is your delivery time?
    A: Generally it is 5-15 days if the goods are in stock or it is 15-20 days if the goods are not in stock.It is according to quantity.

    Q: Do you provide samples ? Is it free or extra ?
    A: Yes, we could offer the sample for free charge.

    Q: What is your terms of payment ?
    A:Payment terms:30% down payment, 70% on Copy of B/L.
    Other Payment terms(LC) : letter of credit 60 days leave Qingdao port and 10% deposit.


    If any question, please feel free to contact us !

    Send your message to this supplier

    *From:
    *To:
    *Message:

    Enter between 20 to 4,000 characters.

    This is not what you are looking for? Post a Sourcing Request Now
    Contact Supplier