Efficient High-Quality Formwork Options for Innovative Building Needs

Product Details
Customization: Available
After-sales Service: Contact Us If You Need Any Help
Warranty: None
Still deciding? Get samples of $ !
Request Sample
Manufacturer/Factory & Trading Company

360° Virtual Tour

Diamond Member Since 2024

Suppliers with verified business licenses

Audited Supplier Audited Supplier

Audited by an independent third-party inspection agency

Importers and Exporters
The supplier has import and export rights
Fast Delivery
The supplier can deliver the goods within 15 days
Management Certification
The supplier has quality management system certification, including:
ISO45001:2018 certificate
ISO9001:2015 certificate
ISO14001
Environmental Protection
The supplier has relevant environmental protection qualifications, including:
-Environmental impact assessment report
-The company have EIA reply
-The supplier actual founding consistent with EIA acceptance comments
-Pollution discharge permit
-Fixed pollution source pollution discharge registration
to see all verified strength labels (19)
  • Efficient High-Quality Formwork Options for Innovative Building Needs
  • Efficient High-Quality Formwork Options for Innovative Building Needs
  • Efficient High-Quality Formwork Options for Innovative Building Needs
  • Efficient High-Quality Formwork Options for Innovative Building Needs
  • Efficient High-Quality Formwork Options for Innovative Building Needs
  • Efficient High-Quality Formwork Options for Innovative Building Needs
Find Similar Products
  • Overview
  • FAQ
Overview

Basic Info.

Model NO.
Aluminum Formwork
Type
Industrial Aluminium Profile
Shape
Flat
Grade
6061-T6
Temper
T3-T8
Window & Door Aluminium Profile
Industrial Aluminum Profile
Alloy
Alloy
Surface Finishing
Powder Spraying
Alloying Ingredient
6061
Certification
ISO
Polished Aluminum Profile
Mechanical Polishing
Aluminium Grade
6061-T6
Tonnage/Contaioner
25 Ton
Package
Not Packed or Fumigated Wood Packaging
HS
8480600090
Density
2.72
Currency
USD
Transport Package
Container
Specification
Contact us for specific details
Trademark
Yingmo
Origin
Shangqiu Minquan
HS Code
8480600090
Production Capacity
10W-20W Square Meters / Mouth

Product Description

 
Aluminum Formwork Assembly: A Comprehensive Guide to Modern Construction Solutions

In the ever-evolving landscape of contemporary construction, the aluminum formwork assembly stands as a revolutionary cornerstone, redefining how structures are created. With the precision of prefabricated aluminum panels and components at its core, this formwork system masterfully crafts flawless molds for concrete pouring, offering unparalleled efficiency and reusability. This cutting-edge approach not only transcends traditional techniques but also delivers superior speed, quality, and sustainability. Embark on a detailed exploration below:

 
Efficient High-Quality Formwork Options for Innovative Building Needs

Panel Placement: Precision and Ease Combined:

  • Step 1 Step 1 involves carefully arranging the state-of-the-art, lightweight aluminum formwork panels into the predetermined setup, meticulously following the architectural blueprint of the project.
  • These pre-engineered panels interlock seamlessly, ensuring dimensional accuracy and faithfully capturing the architectural vision of the structure once the concrete sets.
  • Thanks to their ultra-light composition, these aluminum panels are easily maneuverable, reducing worker fatigue and accelerating the entire assembly process.
  • Securing Panels: Ensuring Stability and Integrity:

    • In Step 2, panels are firmly anchored using a variety of connectors such as clips, bolts, and wedges, each playing a crucial role in maintaining the assembly's structural integrity.
    • These securing components hold the panels steadfastly together, forming a robust and stable mold that prevents any potential gaps or misalignments.
    • Ingeniously designed corner and edge connectors bolster the formwork's robustness, ensuring a tight seal during concrete pouring, effectively preventing leaks.
Efficient High-Quality Formwork Options for Innovative Building Needs
CUSTOMER:  Incoterm:  FOB QingDao
 
Date: Dec 24th
Part No. Part Description Unit price (USD/kg) Processing charges USD/kg Transport from Minquan to Qingdao Port USD/kg
1 C100-C500 Panel  < A00(Changjiang Ingot price)(Today USD2.725)/1.13 USD 0.49/kg USD 0.08/Kg 
2 C600 Panel  USD 0.61/kg
3 C100-C400 <(aluminum formwork (extrusion)) A00(Changjiang Ingot price)(Today USD2.725)/1.13 USD 0.34/kg USD 0.053/kg
4 C400-450-500(aluminum formwork(extrusion)) USD 0.40/kg
5 C600(aluminum formwork(extrusion)) USD 0.50/kg
Efficient High-Quality Formwork Options for Innovative Building Needs
Efficient High-Quality Formwork Options for Innovative Building Needs
  • Adjustment and Alignment: Achieving Perfect Symmetry:

    • Once panels are positioned, Step 3 requires meticulous adjustment to achieve perfect alignment and leveling, a critical operation for ensuring construction integrity.
    • Perfect alignment is vital, guarding the structural integrity and precise geometry of your concrete masterpiece, ensuring that dimensions and stability are impeccable.
  • Reinforcement Installation: Building Strength from Within:

    • Step 4 entails the strategic placement of essential steel reinforcement bars (rebar) within the formwork according to the structural design blueprints.
    • Rebar is indispensable, providing tensile strength to the concrete, minimizing cracking, and granting enduring structural resilience once the concrete cures.
    • Each bar is precisely positioned, ensuring optimal integration into the concrete during the subsequent pouring process.
Efficient High-Quality Formwork Options for Innovative Building Needs

Concrete Pouring: The Final Pour to Perfection:

  • With all preparations complete, Step 5 initiates the transformative act of pouring concrete into the mold, a pivotal phase in the construction journey.
  • The dependable aluminum panels maintain the concrete's exact shape, ensuring a flawless surface finish upon removal.
  • Utilizing aluminum formwork substantially enhances the finish quality, minimizing the need for additional finishing work post-hardening.

Efficient High-Quality Formwork Options for Innovative Building Needs
Dismantling and Reuse: Embracing Sustainability
:

  • Post-curing, the process culminates in Step 6 , which involves the careful dismantling of the formwork, emphasizing sustainability and cost-efficiency.
  • The durability and corrosion resistance of aluminum enable these panels to be reused countless times, highlighting the formwork's eco-friendly and budget-conscious benefits.
  • At Henan Yingmo Aluminum Co., Ltd., our panels are subject to an exceptionally thorough cleaning process and rigorous inspection. This ensures they are impeccably primed and ready for their next use. Such meticulous attention not only minimizes waste but also maximizes resource efficiency, establishing a pioneering standard in sustainable construction practices. We exemplify our unwavering commitment to environmental stewardship, setting a new benchmark in eco-friendly building solutions.
Efficient High-Quality Formwork Options for Innovative Building Needs

Advantages of Aluminum Formwork Assembly: Transforming the Construction Industry Like Never Before

  • Speeding Up Construction with Unmatched Efficiency: Our ultra-lightweight, expertly crafted panels facilitate effortless handling and rapid assembly. This dramatically reduces construction timelines, propelling projects toward swift and seamless completion, ensuring your project is on the fast track to success.
  • Superior Quality Finish: A Testament to Perfection: Uncover the extraordinary benefits of our aluminum formwork, precisely engineered to deliver smooth and meticulously accurate concrete surfaces. This revolutionary technology virtually eliminates the need for extensive post-pour finishing, ensuring a flawless finish with every application. We are redefining the quality standards in construction, elevating them to new heights.
  • Outstanding Reusability for Sustainable Building: Our aluminum formwork boasts exceptional durability and reusability, meticulously designed to withstand numerous concrete pours. This unparalleled feature not only leads to substantial material cost savings but also significantly curtails construction waste, offering immense economic and environmental advantages.
  • Unparalleled Cost-Effectiveness for Smart Investments: Step into the future of construction with our aluminum formwork, where initial investments yield profound long-term financial benefits. Experience remarkable savings through its incredible reusability and minimized labor expenses, positioning this formwork as the epitome of cost-effectiveness and strategic financial prudence.
  • Enhanced Safety Standards: Prioritizing Team Well-Being: With a steadfast focus on the health and safety of construction teams, our lightweight aluminum formwork system showcases superior safety features. Its ease of handling significantly reduces physical strain, elevating safety standards on construction sites. This fosters a healthier, more productive work environment, ensuring peace of mind for every worker.

In Conclusion:

Our aluminum formwork assembly sets a new gold standard for efficiency and effectiveness, offering a streamlined process that surpasses traditional formwork systems. It guarantees rapid assembly, flawless finishes, and outstanding reusability, thereby expediting construction timelines and dramatically cutting project costs. This makes it the quintessential choice for tackling the intricate challenges of modern construction projects, setting the stage for future building innovations.

    FAQ

    Q: Are you trading company or manufacturer ?
    A: We are factory.

    Q: How long is your delivery time?
    A: Generally it is 5-15 days if the goods are in stock or it is 15-20 days if the goods are not in stock.It is according to quantity.

    Q: Do you provide samples ? Is it free or extra ?
    A: Yes, we could offer the sample for free charge.

    Q: What is your terms of payment ?
    A:Payment terms:30% down payment, 70% on Copy of B/L.
    Other Payment terms(LC) : letter of credit 60 days leave Qingdao port and 10% deposit.


    If any question, please feel free to contact us !

    Send your message to this supplier

    *From:
    *To:
    *Message:

    Enter between 20 to 4,000 characters.

    This is not what you are looking for? Post a Sourcing Request Now
    Contact Supplier