Durable Aluminum Formwork System for High-Quality Building Projects

Product Details
Customization: Available
After-sales Service: Contact Us If You Need Any Help
Warranty: None
Still deciding? Get samples of $ !
Request Sample
Manufacturer/Factory & Trading Company

360° Virtual Tour

Diamond Member Since 2024

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Importers and Exporters
The supplier has import and export rights
Fast Delivery
The supplier can deliver the goods within 15 days
Management Certification
The supplier has quality management system certification, including:
ISO45001:2018 certificate
ISO9001:2015 certificate
ISO14001
Environmental Protection
The supplier has relevant environmental protection qualifications, including:
-Environmental impact assessment report
-The company have EIA reply
-The supplier actual founding consistent with EIA acceptance comments
-Pollution discharge permit
-Fixed pollution source pollution discharge registration
to see all verified strength labels (19)
  • Durable Aluminum Formwork System for High-Quality Building Projects
  • Durable Aluminum Formwork System for High-Quality Building Projects
  • Durable Aluminum Formwork System for High-Quality Building Projects
  • Durable Aluminum Formwork System for High-Quality Building Projects
  • Durable Aluminum Formwork System for High-Quality Building Projects
  • Durable Aluminum Formwork System for High-Quality Building Projects
Find Similar Products
  • Overview
  • FAQ
Overview

Basic Info.

Model NO.
Aluminum Formwork
Type
Industrial Aluminium Profile
Shape
Flat
Grade
6061-T6
Temper
T3-T8
Window & Door Aluminium Profile
Industrial Aluminum Profile
Alloy
Alloy
Surface Finishing
Powder Spraying
Alloying Ingredient
6061
Certification
ISO
Polished Aluminum Profile
Mechanical Polishing
Aluminium Grade
6061-T6
Tonnage/Contaioner
25 Ton
Package
Not Packed or Fumigated Wood Packaging
HS
8480600090
Density
2.72
Currency
USD
Transport Package
Container
Specification
Contact us for specific details
Trademark
Yingmo
Origin
Shangqiu Minquan
HS Code
8480600090
Production Capacity
10W-20W Square Meters / Mouth

Product Description

 
Aluminum Formwork Assembly: A Comprehensive Insight

Aluminum formwork assembly stands as a pivotal innovation in the realm of modern construction. Utilizing prefabricated aluminum panels and components, this process efficiently creates molds for concrete pouring. Compared to traditional methods, it offers unparalleled speed, efficiency, and reusability. Let us delve deeper into the intricacies of this remarkable process.

 
Durable Aluminum Formwork System for High-Quality Building Projects

Panel Placement:

  • Step 1 commences with the strategic placement of lightweight aluminum formwork panels, meticulously arranged to align with the project's design and layout specifications.
  • These panels, pre-engineered for seamless integration, ensure flawless dimensions, guaranteeing the structural shape's preciseness as the concrete is poured.
  • Thanks to their featherweight nature, aluminum panels are incredibly easy to maneuver, minimizing worker fatigue and accelerating the overall process.
  • Securing Panels:

    • In Step 2, the panels are meticulously secured using an array of connectors, including clips, bolts, and wedges.
    • These fastening mechanisms guarantee a robust, tightly-bound mold, eliminating any potential for gaps or misalignment.
    • Ingeniously designed accessories such as corner and edge connectors uphold the formwork's structural integrity, thwarting any leaks during the concrete pouring phase.
Durable Aluminum Formwork System for High-Quality Building Projects
CUSTOMER:  Incoterm:  FOB QingDao
 
Date: Dec 24th
Part No. Part Description Unit price (USD/kg) Processing charges USD/kg Transport from Minquan to Qingdao Port USD/kg
1 C100-C500 Panel  < A00(Changjiang Ingot price)(Today USD2.725)/1.13 USD 0.49/kg USD 0.08/Kg 
2 C600 Panel  USD 0.61/kg
3 C100-C400 <(aluminum formwork (extrusion)) A00(Changjiang Ingot price)(Today USD2.725)/1.13 USD 0.34/kg USD 0.053/kg
4 C400-450-500(aluminum formwork(extrusion)) USD 0.40/kg
5 C600(aluminum formwork(extrusion)) USD 0.50/kg
Durable Aluminum Formwork System for High-Quality Building Projects
Durable Aluminum Formwork System for High-Quality Building Projects
  • Adjustment and Alignment:

    • Once the panels are established, Step 3 entails meticulous fine-tuning for perfect alignment and leveling.
    • Achieving precise alignment is crucial for sustaining the structural integrity and geometrical precision of the concrete framework, ensuring flawless dimensions and stability in walls, floors, or slabs.
  • Reinforcement Installation:

    • Step 4 involves the strategic placement of essential steel reinforcement bars (rebar) within the formwork, adhering to specified design requirements.
    • Rebar is indispensable for imparting tensile strength to the concrete, effectively thwarting potential cracking or structural failure once the concrete cures.
    • Careful positioning of reinforcement ensures its optimal embedding within the concrete during the pouring procedure.
Durable Aluminum Formwork System for High-Quality Building Projects

Concrete Pouring:

  • With the formwork and reinforcement meticulously set, Step 5 involves the precise pouring of concrete into the expertly crafted mold.
  • Aluminum panels adeptly support the concrete, maintaining its intended shape as it sets, resulting in a smooth, accurate finish once the formwork is removed.
  • Aluminum formwork ensures a superior finish, minimizing the necessity for extensive post-curing finishing work.

Durable Aluminum Formwork System for High-Quality Building Projects
Dismantling and Reuse
:

  • Upon full curing of the concrete, Step 6 involves the careful dismantling of the formwork system.
  • Thanks to aluminum's remarkable durability and resistance to corrosion, these panels can be reused extensively, making them a highly cost-effective and eco-friendly choice.
  • The panels are meticulously cleaned, inspected for any signs of wear, and prepared for future ventures, significantly reducing both material wastage and associated costs.
Durable Aluminum Formwork System for High-Quality Building Projects

Advantages of Aluminum Formwork Assembly:

  • Accelerated Construction: The lightweight, easily manageable panels expedite the construction process, leading to quicker project timelines and completion.
  • Superior Quality Finish: Experience the ultimate in precision and smoothness with our aluminum formwork system, which ensures impeccably even concrete surfaces. This state-of-the-art solution minimizes the need for post-pour refinishing, saving you time and resources in creating immaculate structures.
  • Reusability: Our aluminum formwork is designed to be used again and again for numerous concrete pours. This outstanding reusability translates into substantial savings on materials, while also playing a significant role in reducing environmental waste-all without compromising quality.
  • Cost-Effectiveness: Despite a potentially higher initial outlay compared to conventional formwork, aluminum formwork proves its value over time. The long-term savings achieved through its remarkable reusability and the reduction in labor costs emphasize its superior cost-effectiveness in construction applications.
  • Safety: Featuring a lightweight, user-friendly design, our system significantly reduces worker fatigue and enhances safety on the construction site. This ease of handling not only boosts productivity but also prioritizes the well-being of your workforce.

Conclusion:

Our aluminum formwork assembly process is designed with efficiency and sophistication in mind, offering a host of advantages over traditional methods. With rapid assembly capabilities, impeccable finishing, and exceptional reusability, it accelerates your construction timelines and slashes project costs, positioning it as the premier choice for today's forward-thinking construction projects.

    FAQ

    Q: Are you trading company or manufacturer ?
    A: We are factory.

    Q: How long is your delivery time?
    A: Generally it is 5-15 days if the goods are in stock or it is 15-20 days if the goods are not in stock.It is according to quantity.

    Q: Do you provide samples ? Is it free or extra ?
    A: Yes, we could offer the sample for free charge.

    Q: What is your terms of payment ?
    A:Payment terms:30% down payment, 70% on Copy of B/L.
    Other Payment terms(LC) : letter of credit 60 days leave Qingdao port and 10% deposit.


    If any question, please feel free to contact us !

    Send your message to this supplier

    *From:
    *To:
    *Message:

    Enter between 20 to 4,000 characters.

    This is not what you are looking for? Post a Sourcing Request Now
    Contact Supplier