Innovative Durable Formwork Options for High-Quality Project Efficiency

Product Details
Customization: Available
After-sales Service: Contact Us If You Need Any Help
Warranty: None
Still deciding? Get samples of $ !
Request Sample
Manufacturer/Factory & Trading Company

360° Virtual Tour

Diamond Member Since 2024

Suppliers with verified business licenses

Audited Supplier Audited Supplier

Audited by an independent third-party inspection agency

Importers and Exporters
The supplier has import and export rights
Fast Delivery
The supplier can deliver the goods within 15 days
Management Certification
The supplier has quality management system certification, including:
ISO45001:2018 certificate
ISO9001:2015 certificate
ISO14001
Environmental Protection
The supplier has relevant environmental protection qualifications, including:
-Environmental impact assessment report
-The company have EIA reply
-The supplier actual founding consistent with EIA acceptance comments
-Pollution discharge permit
-Fixed pollution source pollution discharge registration
to see all verified strength labels (19)
  • Innovative Durable Formwork Options for High-Quality Project Efficiency
  • Innovative Durable Formwork Options for High-Quality Project Efficiency
  • Innovative Durable Formwork Options for High-Quality Project Efficiency
  • Innovative Durable Formwork Options for High-Quality Project Efficiency
  • Innovative Durable Formwork Options for High-Quality Project Efficiency
  • Innovative Durable Formwork Options for High-Quality Project Efficiency
Find Similar Products
  • Overview
  • FAQ
Overview

Basic Info.

Model NO.
Aluminum Formwork
Type
Industrial Aluminium Profile
Shape
Flat
Grade
6061-T6
Temper
T3-T8
Window & Door Aluminium Profile
Industrial Aluminum Profile
Alloy
Alloy
Surface Finishing
Powder Spraying
Alloying Ingredient
6061
Certification
ISO
Polished Aluminum Profile
Mechanical Polishing
Aluminium Grade
6061-T6
Tonnage/Contaioner
25 Ton
Package
Not Packed or Fumigated Wood Packaging
HS
8480600090
Density
2.72
Currency
USD
Transport Package
Container
Specification
Contact us for specific details
Trademark
Yingmo
Origin
Shangqiu Minquan
HS Code
8480600090
Production Capacity
10W-20W Square Meters / Mouth

Product Description

 
Aluminum Formwork Assembly: A Comprehensive Guide to Modern Construction Solutions

In the dynamic and ever-transforming realm of contemporary construction, aluminum formwork assembly emerges as a groundbreaking pivotal element, transforming the methodologies of structure realization. By leveraging precision-crafted prefabricated aluminum panels and components, this avant-garde system serves as the perfect mold for concrete pouring, achieving extraordinary levels of efficiency and uniformity. By surpassing conventional construction techniques, it delivers unmatched speed, quality, and sustainability. Immerse yourself in the thorough examination below:

 
Innovative Durable Formwork Options for High-Quality Project Efficiency

Panel Placement: Precision and Ease Combined:

  • Step 1 Step 1 is the precise and thoughtful arrangement of lightweight, cutting-edge aluminum formwork panels in the planned layout, carefully following the architectural blueprint of your distinctive project.
  • These expertly engineered panels interlock with meticulous precision, guaranteeing dimensional accuracy while preserving the architectural vision of the structure post-concrete setting.
  • Owing to their ultra-light properties, these aluminum panels are easily handled, significantly minimizing worker fatigue and streamlining the entire assembly process.
  • Securing Panels: Ensuring Stability and Integrity:

    • In Step 2, the panels are securely anchored using an array of connectors such as clips, bolts, and wedges, each playing a pivotal role in safeguarding the structure's stability.
    • These durable securing elements hold the panels together with steadfast strength, creating a robust mold that eradicates potential gaps or misalignments.
    • Ingeniously crafted corner and edge connectors bolster the formwork's power, assuring a tight seal during concrete pouring, effectively preventing leaks.
Innovative Durable Formwork Options for High-Quality Project Efficiency
CUSTOMER:  Incoterm:  FOB QingDao
 
Date: Dec 24th
Part No. Part Description Unit price (USD/kg) Processing charges USD/kg Transport from Minquan to Qingdao Port USD/kg
1 C100-C500 Panel  < A00(Changjiang Ingot price)(Today USD2.725)/1.13 USD 0.49/kg USD 0.08/Kg 
2 C600 Panel  USD 0.61/kg
3 C100-C400 <(aluminum formwork (extrusion)) A00(Changjiang Ingot price)(Today USD2.725)/1.13 USD 0.34/kg USD 0.053/kg
4 C400-450-500(aluminum formwork(extrusion)) USD 0.40/kg
5 C600(aluminum formwork(extrusion)) USD 0.50/kg
Innovative Durable Formwork Options for High-Quality Project Efficiency
Innovative Durable Formwork Options for High-Quality Project Efficiency
  • Adjustment and Alignment: Achieving Perfect Symmetry:

    • Once panels are positioned, Step 3 entails the careful adjustment necessary to achieve perfect alignment and leveling, a crucial task for maintaining the construction's structural integrity.
    • Perfect alignment is critical in ensuring the concrete's structural integrity and precise geometry, guaranteeing impeccable dimensions and unwavering stability.
  • Reinforcement Installation: Building Strength from Within:

    • Step 4 involves the strategic placement of crucial steel reinforcement bars (rebar) within the formwork, meticulously following the structural design.
    • Rebar is essential for providing the much-needed tensile strength to the concrete, minimizing cracking, and ensuring enduring structural robustness once the concrete cures.
    • Each bar is meticulously positioned to ensure optimal integration within the concrete during the forthcoming pouring process.
Innovative Durable Formwork Options for High-Quality Project Efficiency

Concrete Pouring: The Final Pour to Perfection:

  • With all preparations finalized, Step 5 initiates the transformative process of pouring concrete into the mold, marking a pivotal phase in the construction journey.
  • The dependable aluminum panels maintain the concrete's precise shape, ensuring a flawless surface finish once removed.
  • Utilizing aluminum formwork significantly enhances finish quality, minimizing the need for further finishing work post-hardening.

Innovative Durable Formwork Options for High-Quality Project Efficiency
Dismantling and Reuse: Embracing Sustainability
:

  • Once curing is complete, the process culminates in Step 6 , which involves the careful dismantling of the formwork, emphasizing sustainability and cost-effectiveness.
  • The durability and corrosion resistance of aluminum allow these panels to be reused multiple times, reinforcing the formwork's eco-friendly and cost-efficient advantages.
  • Our panels undergo an exceptionally rigorous cleansing and inspection process, ensuring they are immaculately prepared and immediately ready for reuse. This meticulous protocol not only drastically minimizes waste but also maximizes resource efficiency. By doing so, Henan Yingmo Aluminum Co., Ltd. is setting a groundbreaking precedent for sustainable construction practices, showcasing our unwavering commitment to environmental responsibility.
Innovative Durable Formwork Options for High-Quality Project Efficiency

Advantages of Aluminum Formwork Assembly: Pioneering the Construction Industry with Cutting-Edge Innovation

  • Accelerated Construction Timelines: Propel Your Projects Towards Completion at Unprecedented Speeds: Our ultra-lightweight panels are ingeniously crafted for effortless maneuverability and rapid assembly, significantly slashing construction timelines and propelling projects towards quick and seamless completion.
  • Superior Quality Finish: Diligently Crafted to Perfection for Unmatched Aesthetic Brilliance: Experience the extraordinary advantages of our aluminum formwork, precisely engineered to deliver smooth and exceptionally accurate concrete surfaces. This revolutionary technology virtually eliminates the need for extensive post-pour finishing, ensuring a flawless finish with each application, and redefining quality benchmarks in the construction industry.
  • Exceptional Reusability: A Tribute to Longevity and Cost-Efficiency: Our aluminum formwork is distinguished by its extraordinary durability and exceptional reusability, expertly designed to endure countless concrete pours. This remarkable attribute not only results in significant material cost savings but also dramatically cuts down on construction waste, offering immense economic and environmental advantages.
  • Ultimate Cost-Effectiveness: Investing in the Future of Construction: Step into the future of construction with our aluminum formwork. While the initial investment may surpass traditional options, the profound long-term financial benefits are undeniable. Enjoy substantial savings through its remarkable reusability and reduced labor costs, establishing this formwork as the pinnacle of cost-effectiveness and financial acumen.
  • Enhanced Safety Standards: Elevating Worker Health and Safety with Innovative Design: With a strong commitment to the health and safety of construction teams, our lightweight aluminum formwork system showcases superior safety features. Its ease of handling greatly reduces physical strain, thereby enhancing safety standards on construction sites and promoting a healthier, more productive work environment.

Conclusion: Defining the New Standard in Modern Construction:

Our aluminum formwork assembly establishes a new benchmark for efficiency and effectiveness, offering a streamlined process that outperforms traditional systems. It ensures rapid assembly, immaculate finishes, and exceptional reusability, accelerating construction timelines and significantly reducing project costs. This makes it the quintessential choice for tackling the complex challenges of modern construction projects, leading the way for the future of building innovation.

    FAQ

    Q: Are you trading company or manufacturer ?
    A: We are factory.

    Q: How long is your delivery time?
    A: Generally it is 5-15 days if the goods are in stock or it is 15-20 days if the goods are not in stock.It is according to quantity.

    Q: Do you provide samples ? Is it free or extra ?
    A: Yes, we could offer the sample for free charge.

    Q: What is your terms of payment ?
    A:Payment terms:30% down payment, 70% on Copy of B/L.
    Other Payment terms(LC) : letter of credit 60 days leave Qingdao port and 10% deposit.


    If any question, please feel free to contact us !

    Send your message to this supplier

    *From:
    *To:
    *Message:

    Enter between 20 to 4,000 characters.

    This is not what you are looking for? Post a Sourcing Request Now
    Contact Supplier