Innovative Aluminum Formwork System for Effective Building Solutions

Product Details
Customization: Available
After-sales Service: Contact Us If You Need Any Help
Warranty: None
Still deciding? Get samples of US$ 90/Square Meter
Request Sample
Manufacturer/Factory & Trading Company

360° Virtual Tour

Diamond Member Since 2024

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Importers and Exporters
The supplier has import and export rights
Fast Delivery
The supplier can deliver the goods within 15 days
Management Certification
The supplier has quality management system certification, including:
ISO45001:2018 certificate
ISO9001:2015 certificate
ISO14001
Environmental Protection
The supplier has relevant environmental protection qualifications, including:
-Environmental impact assessment report
-The company have EIA reply
-The supplier actual founding consistent with EIA acceptance comments
-Pollution discharge permit
-Fixed pollution source pollution discharge registration
to see all verified strength labels (19)
  • Innovative Aluminum Formwork System for Effective Building Solutions
  • Innovative Aluminum Formwork System for Effective Building Solutions
  • Innovative Aluminum Formwork System for Effective Building Solutions
  • Innovative Aluminum Formwork System for Effective Building Solutions
  • Innovative Aluminum Formwork System for Effective Building Solutions
  • Innovative Aluminum Formwork System for Effective Building Solutions
Find Similar Products
  • Overview
  • FAQ
Overview

Basic Info.

Model NO.
Aluminum Formwork
Type
Industrial Aluminium Profile
Shape
Flat
Grade
6061-T6
Temper
T3-T8
Window & Door Aluminium Profile
Industrial Aluminum Profile
Alloy
Alloy
Surface Finishing
Powder Spraying
Alloying Ingredient
6061
Certification
ISO
Polished Aluminum Profile
Mechanical Polishing
Aluminium Grade
6061-T6
Tonnage/Contaioner
25 Ton
Package
Not Packed or Fumigated Wood Packaging
HS
8480600090
Density
2.72
Currency
USD
Transport Package
Container
Specification
Contact us for specific details
Trademark
Yingmo
Origin
Shangqiu Minquan
HS Code
8480600090
Production Capacity
10W-20W Square Meters / Mouth

Product Description

 
Aluminum Formwork Assembly: Detailed Overview

The aluminum formwork assembly process is a game-changer in modern construction. By utilizing prefabricated aluminum panels and components, this method forms precise molds for concrete pouring. It's an efficient, rapid, and remarkably reusable approach, offering unparalleled advantages over traditional construction techniques. Here's a closer look at how it all comes together:

 
Innovative Aluminum Formwork System for Effective Building Solutions

Panel Placement:

  • Step 1 begins with the strategic placement of lightweight aluminum formwork panels, arranged to match the project's specific design and layout.
  • These meticulously engineered panels seamlessly interlock, ensuring precision in dimensions and accuracy in the structure's shape once the concrete is set.
  • Thanks to their lightweight design, these panels are effortlessly manageable, minimizing physical strain on workers and expediting the assembly process.
  • Securing Panels:

    • In Step 2, the panels are locked in place using an array of connectors like clips, bolts, or wedges, ensuring a robust, gap-free, stable mold.
    • These fastening elements are crucial in maintaining the mold's rigidity, preventing gaps or misalignments, and ensuring flawless structural integrity.
    • Specially crafted accessories, such as corner and edge connectors, are vital in upholding the formwork's integrity and preventing concrete leaks.
Innovative Aluminum Formwork System for Effective Building Solutions
CUSTOMER:  Incoterm:  FOB QingDao
 
Date: Dec 24th
Part No. Part Description Unit price (USD/kg) Processing charges USD/kg Transport from Minquan to Qingdao Port USD/kg
1 C100-C500 Panel  < A00(Changjiang Ingot price)(Today USD2.725)/1.13 USD 0.49/kg USD 0.08/Kg 
2 C600 Panel  USD 0.61/kg
3 C100-C400 <(aluminum formwork (extrusion)) A00(Changjiang Ingot price)(Today USD2.725)/1.13 USD 0.34/kg USD 0.053/kg
4 C400-450-500(aluminum formwork(extrusion)) USD 0.40/kg
5 C600(aluminum formwork(extrusion)) USD 0.50/kg
Innovative Aluminum Formwork System for Effective Building Solutions
Innovative Aluminum Formwork System for Effective Building Solutions
  • Adjustment and Alignment:

    • Once securely positioned, Step 3 focuses on fine-tuning the alignment of panels to achieve perfect leveling and positioning, a critical step to ensure structural integrity.
    • Accurate alignment guarantees that all structural elements, such as walls and floors, meet the design's specified dimensions and stability requirements.
  • Reinforcement Installation:

    • Step 4 involves inserting the required steel reinforcement bars (rebar) into the formwork, following detailed design specifications.
    • Rebar is essential in enhancing the concrete's tensile strength, significantly reducing risks of cracking or structural failure after curing.
    • Careful positioning of the reinforcement ensures optimal embedding within the concrete during the pouring phase.
Innovative Aluminum Formwork System for Effective Building Solutions

Concrete Pouring:

  • With formwork and reinforcement set, Step 5 commences with pouring concrete into the prepared mold, held in place by the aluminum formwork.
  • The aluminum panels maintain the concrete's shape, delivering a smooth, accurate finish once the formwork is removed.
  • This system yields a high-quality surface that often negates the need for extensive post-cure finishing work.

Innovative Aluminum Formwork System for Effective Building Solutions
Dismantling and Reuse
:

  • Once concrete curing is complete, Step 6 involves the careful dismantling of the formwork, readying it for future projects.
  • Aluminum's durability and resistance to corrosion mean panels can be reused extensively, offering an economically and environmentally sustainable solution.
  • Panels are then cleaned, meticulously inspected for wear and tear, and prepared for the next round of use, significantly cutting down on material waste and costs.
Innovative Aluminum Formwork System for Effective Building Solutions

Advantages of Aluminum Formwork Assembly:

  • Faster Construction: Lightweight panels facilitate rapid handling and assembly, significantly accelerating the construction workflow. This efficiency translates into shorter project timelines and faster completion.
  • High-Quality Finish: Experience the art of excellence with our aluminum formwork, expertly crafted to deliver smooth and flawlessly precise concrete surfaces. This ensures a remarkable reduction in the need for excessive post-pour finishing, elevating the overall quality and appeal of your building projects.
  • Reusability: Embrace sustainability and efficiency with aluminum formwork, designed for repeated use across multiple concrete pours. This innovative feature not only offers substantial savings on materials but also significantly reduces waste, aligning with modern eco-friendly construction practices.
  • Cost-Effectiveness: Although the initial investment might be more than traditional formwork, the long-term financial benefits are clear. With outstanding reusability and diminished labor costs, aluminum formwork transforms into an incredibly cost-effective solution, ensuring financial savvy without compromising on quality.
  • Safety: Prioritizing the well-being of your team, our system is lightweight and straightforward to manage, significantly reducing physical strain on workers. This enhancement not only improves site safety but also enhances productivity, making it a valuable asset for any construction endeavor.

Conclusion:

The assembly of aluminum formwork stands as a beacon of innovation in construction, offering an efficient and streamlined process that surpasses traditional formwork systems. With its ease of assembly, superior finishes, and exceptional reusability, it accelerates construction timelines and reduces project costs, thereby emerging as the quintessential choice for forward-thinking construction projects.

    FAQ

    Q: Are you trading company or manufacturer ?
    A: We are factory.

    Q: How long is your delivery time?
    A: Generally it is 5-15 days if the goods are in stock or it is 15-20 days if the goods are not in stock.It is according to quantity.

    Q: Do you provide samples ? Is it free or extra ?
    A: Yes, we could offer the sample for free charge.

    Q: What is your terms of payment ?
    A:Payment terms:30% down payment, 70% on Copy of B/L.
    Other Payment terms(LC) : letter of credit 60 days leave Qingdao port and 10% deposit.


    If any question, please feel free to contact us !

    Send your message to this supplier

    *From:
    *To:
    *Message:

    Enter between 20 to 4,000 characters.

    This is not what you are looking for? Post a Sourcing Request Now
    Contact Supplier