Versatile Aluminum Formwork System for Enhanced Project Flexibility

Product Details
Customization: Available
After-sales Service: Contact Us If You Need Any Help
Warranty: None
Still deciding? Get samples of US$ 90/Square Meter
Request Sample
Manufacturer/Factory & Trading Company
Diamond Member Since 2024

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Importers and Exporters
The supplier has import and export rights
Fast Delivery
The supplier can deliver the goods within 15 days
Management Certification
The supplier has quality management system certification, including:
ISO45001:2018 certificate
ISO9001:2015 certificate
ISO14001
Environmental Protection
The supplier has relevant environmental protection qualifications, including:
-Environmental impact assessment report
-The company have EIA reply
-The supplier actual founding consistent with EIA acceptance comments
-Pollution discharge permit
-Fixed pollution source pollution discharge registration
to see all verified strength labels (19)
  • Versatile Aluminum Formwork System for Enhanced Project Flexibility
  • Versatile Aluminum Formwork System for Enhanced Project Flexibility
  • Versatile Aluminum Formwork System for Enhanced Project Flexibility
  • Versatile Aluminum Formwork System for Enhanced Project Flexibility
  • Versatile Aluminum Formwork System for Enhanced Project Flexibility
  • Versatile Aluminum Formwork System for Enhanced Project Flexibility
Find Similar Products
  • Overview
  • FAQ
Overview

Basic Info.

Model NO.
Aluminum Formwork
Type
Industrial Aluminium Profile
Shape
Flat
Grade
6061-T6
Temper
T3-T8
Window & Door Aluminium Profile
Industrial Aluminum Profile
Alloy
Alloy
Surface Finishing
Powder Spraying
Alloying Ingredient
6061
Certification
ISO
Polished Aluminum Profile
Mechanical Polishing
Aluminium Grade
6061-T6
Tonnage/Contaioner
25 Ton
Package
Not Packed or Fumigated Wood Packaging
HS
8480600090
Density
2.72
Currency
USD
Transport Package
Container
Specification
Contact us for specific details
Trademark
Yingmo
Origin
Shangqiu Minquan
HS Code
8480600090
Production Capacity
10W-20W Square Meters / Mouth

Product Description

 
Aluminum Formwork Assembly: Detailed Overview

Aluminum formwork assembly is a transformative process in the realm of modern construction. Utilizing prefabricated aluminum panels and components, this method creates molds for pouring concrete, distinguishing itself with remarkable efficiency, speed, and reusability. It offers an impressive array of advantages over traditional techniques. Here's a comprehensive breakdown:

 
Versatile Aluminum Formwork System for Enhanced Project Flexibility

Panel Placement:

  • Step 1 entails the strategic placement of lightweight aluminum formwork panels in a configuration meticulously designed to match the project's specific layout and architectural blueprint.
  • These panels are ingeniously pre-engineered to interlock seamlessly, ensuring precision in dimensions and accuracy in the structural shape once concrete is poured.
  • Owing to their feather-light design, these aluminum panels are effortlessly handled, substantially mitigating physical strain on workers and expediting the construction process.
  • Securing Panels:

    • In Step 2, the panels are meticulously secured using an assortment of connectors, including clips, bolts, and wedges, to ensure robustness.
    • Such fastening devices guarantee that panels are cohesively joined, forming a sturdy, stable mold that prevents gaps or misalignments.
    • Ingeniously designed accessories such as corner and edge connectors bolster the formwork's integrity, averting leaks during concrete pouring.
Versatile Aluminum Formwork System for Enhanced Project Flexibility
CUSTOMER:  Incoterm:  FOB QingDao
 
Date: Dec 24th
Part No. Part Description Unit price (USD/kg) Processing charges USD/kg Transport from Minquan to Qingdao Port USD/kg
1 C100-C500 Panel  < A00(Changjiang Ingot price)(Today USD2.725)/1.13 USD 0.49/kg USD 0.08/Kg 
2 C600 Panel  USD 0.61/kg
3 C100-C400 <(aluminum formwork (extrusion)) A00(Changjiang Ingot price)(Today USD2.725)/1.13 USD 0.34/kg USD 0.053/kg
4 C400-450-500(aluminum formwork(extrusion)) USD 0.40/kg
5 C600(aluminum formwork(extrusion)) USD 0.50/kg
Versatile Aluminum Formwork System for Enhanced Project Flexibility
Versatile Aluminum Formwork System for Enhanced Project Flexibility
  • Adjustment and Alignment:

    • Once the panels are securely positioned, Step 3 entails precise adjustments to align and level the panels perfectly.
    • Such meticulous alignment is crucial to uphold the structural integrity and geometry of the concrete construction, ensuring that all walls, floors, or slabs attain the intended dimensions and stability.
  • Reinforcement Installation:

    • Step 4 involves the meticulous placement of essential steel reinforcement bars (rebar) within the formwork, adhering strictly to the design's specifications.
    • Rebar is fundamental in imparting tensile strength to the concrete, safeguarding against cracking and failure post curing.
    • The reinforcement is precisely positioned to ensure optimal embedding within the concrete throughout the pouring stage.
Versatile Aluminum Formwork System for Enhanced Project Flexibility

Concrete Pouring:

  • With both formwork and reinforcement optimally arranged, Step 5 is the pivotal concrete pouring into the meticulously prepared mold.
  • The aluminum panels dutifully sustain the concrete's intended shape as it sets, guaranteeing a smooth, accurate surface post formwork removal.
  • Aluminum formwork ensures a superior quality finish, significantly minimizing the need for further finishing touches once concrete hardens.

Versatile Aluminum Formwork System for Enhanced Project Flexibility
Dismantling and Reuse
:

  • Following complete concrete curing, Step 6 entails the careful dismantling of the formwork with precision.
  • Given aluminum's substantial durability and resistance to corrosion, these panels can be repeatedly reused, rendering aluminum formwork a cost-effective and sustainable solution.
  • The panels undergo a thorough cleaning, are assessed for wear, and are prepared for reutilization in future ventures, thus significantly cutting down on material waste and costs.
Versatile Aluminum Formwork System for Enhanced Project Flexibility

Advantages of Aluminum Formwork Assembly:

  • Faster Construction: The lightweight nature of these panels allows for effortless handling and rapid assembly, accelerating the overall construction timeline and facilitating swifter project completion.
  • High-Quality Finish: The aluminum formwork ensures the delivery of smooth, impeccably precise concrete surfaces, significantly minimizing the necessity for comprehensive post-pour finishing. This advantage enhances not only the aesthetic appeal but also the structural accuracy, streamlining the construction process with unparalleled efficiency.
  • Reusability: Aluminum formwork stands out for its exceptional reusability across multiple concrete pouring operations, which translates into remarkable savings on material costs and a substantial reduction in construction waste. This eco-friendly approach underscores our commitment to sustainable building practices.
  • Cost-Effectiveness: While the initial investment may surpass that of traditional formwork options, the enduring financial benefits derived from its reusability and the subsequent reduction in labor expenses render aluminum formwork a highly cost-effective solution. The long-term economic efficiency makes it an invaluable asset for budget-conscious projects.
  • Safety: This innovative system's lightweight and user-friendly design significantly decreases physical exertion on workers, thereby enhancing safety standards on construction sites. By prioritizing worker well-being, it contributes to a safer, more productive work environment.

Conclusion:

Aluminum formwork assembly epitomizes a streamlined, highly efficient process that boasts numerous advantages over conventional formwork systems. From rapid assembly times to superior finish quality and outstanding reusability, it accelerates construction timelines while reducing costs, establishing itself as the optimal choice for contemporary construction endeavors.

    FAQ

    Q: Are you trading company or manufacturer ?
    A: We are factory.

    Q: How long is your delivery time?
    A: Generally it is 5-15 days if the goods are in stock or it is 15-20 days if the goods are not in stock.It is according to quantity.

    Q: Do you provide samples ? Is it free or extra ?
    A: Yes, we could offer the sample for free charge.

    Q: What is your terms of payment ?
    A:Payment terms:30% down payment, 70% on Copy of B/L.
    Other Payment terms(LC) : letter of credit 60 days leave Qingdao port and 10% deposit.


    If any question, please feel free to contact us !

    Send your message to this supplier

    *From:
    *To:
    *Message:

    Enter between 20 to 4,000 characters.

    This is not what you are looking for? Post a Sourcing Request Now
    Contact Supplier